宁夏固原天润三营一期49.5MW风电工程电气安装工程质量验评范围划分表工程编号工 程 项 目 名 称性质施工单位监理单位质量验评及签证表编号(DL/T)系统单位工程分部工程分项工程班组施工队项目部03宁夏固原天润三营一期49.5MW风电工程电气安装1主变压器系统设备安装√√√5161.1-表4.0.31主变压器安装√√√5161.1-表4.0.21主变压器本体安装√√√√5161.3-表1.0.3-12主变压器检查主要√√√√5161.3-表1.0.3-23主变压器附件安装√√√√5161.3-表1.0.3-34主变压器注油及密封试验主要√√√√5161.3-表1.0.3-45主变压器整体检查主要√√√√5161.3-表1.0.3-52主变压器系统附属设备安装√√√5161.1-表4.0.21中性点隔离开关安装√√5161.2-表5.0.12中性点电流互感器、避雷器安装√√5161.2-表6.0.23控制柜及端子箱检查安装√√5161.8-表4.0.24软母线安装√√5161.4-表7.0.23主变压器带电试运主要√√√5161.3-表4.0.92主控及直流设备安装√√√5161.1-表4.0.31主控室设备安装√√√5161.1-表4.0.21控制及保护和自动化屏安装√√5161.8-表1.0.25161.8-表5.0.22直流屏及充电设备√√5161.13-表2.0.23二次回路检查及接线√√5161.8-表7.0.22蓄电池组安装√√√5161.1-表4.0.21蓄电池安装√√√√5161.9-表1.0.25161.9-表2.0.22充放电及容量测定主要√√√√5161.9-表3.0.33110KV配电装置安装√√√5161.1-表4.0.31主母线安装√√√5161.1-表4.0.21绝缘子串安装√√5161.4-表2.0.22软母线安装主要√√√√5161.4-表6.0.22电压互感器及避雷器间隔安装√√√5161.1-表4.0.21避雷器安装√√5161.2-表6.0.22电压互感器安装√√5161.3-表3.0.23隔离开关及接地开关安装√√√√5161.2-表5.0.14引下线及跳线安装√√√√5161.4-表7.0.25就地控制设备安装√√5161.8-表1.0.25161.8-表4.0.23主变进线间隔安装√√√5161.1-表4.0.21隔离开关安装√√√√5161.2-表5.0.12断路器安装主要√√√√5161.2-表2.0.13电流互感器安装√√5161.3-表3.0.24避雷器安装√√5161.2-表6.0.25绝缘子串安装√√5161.4-表2.0.26引下线及跳线安装√√√√5161.4-表7.0.27就地控制设备安装√√5161.8-表1.0.25161.8-表4.0.24出线间隔安装√√√5161.1-表4.0.21隔离开关安装√√√√5161.2-表5.0.12断路器安装主要√√√√5161.2-表2.0.13电压互感器安装√√5161.3-表3.0.24电流互感器安装√√5161.3-表3.0.25引下线及跳线安装√√√√5161.4-表7.0.26就地控制设备安装√√5161.8-表1.0.25161.8-表4.0.25110KV配电装置带电试运主要√√√5161.1-表5.0.5-1435KV及站用配电装置安装√√√5161.1-表4.0.31主母线安装√√√5161.1-表4.0.21绝缘子串安装√√5161.4-表2.0.22软母线安装√√√√5161.4-表7.0.22I母母线设备间隔间隔安装√√√5161.1-表4.0.21避雷器安装√√5161.2-表6.0.22电压互感器安装√√5161.3-表3.0.23隔离开关安装√√√√5161.2-表5.0.14引下线及跳线安装√√√√5161.4-表7.0.25矩形母线制作安装主要√√√√5161.4-表3.0.26就地控制设备安装√√5161.8-表1.0.25161.8-表4.0.23集电线路一期进线1U间隔安装√√√5161.1-表4.0.21隔离开关安装√√√√5161.2-表5.0.12断路器安装主要√√√√5161.2-表2.0.13电流互感器安装√√5161.3-表3.0.24引下线及跳线安装√√√√5161.4-表7.0.25就地控制设备安装√√5161.8-表1.0.25161.8-表4.0.24集电线路一期进线2U间隔安装√√√5161.1-表4.0.21隔离开关安装√√√√5161.2-表5.0.12断路器安装主要√√√√5161.2-表2.0.13电流互感器安装√√5161.3-表3.0.24引下线及跳线安装√√√√5161.4-表7.0.25就地控制设备安装√√5161.8-表1.0.25161.8-表4.0.25集电线路一期进线3U间隔安装√√√5161.1-表4.0.21隔离开关安装√√√√5161.2-表5.0.12断路器安装主要√√√√5161.2-表2.0.13电流互感器安装√√5161.3-表3.0.24引下线及跳线安装√√√√5161.4-表7.0.25就地控制设备安装√√5161.8-表1.0.25161.8-表4.0.26集电线路二期进线4U间隔安装√√√5161.1-表4.0.21隔离开关安装√√√√5161.2-表5.0.12断路器安装主要√√√√5161.2-表2.0.13电流互感器安装√√5161.3-表3.0.24引下线及跳线安装√√√√5161.4-表7.0.25就地控制设备安装√√5161.8-表1.0.25161.8-表4.0.27集电线路二期进线5U间隔安装√√√5161.1-表4.0.21隔离开关安装√√√√5161.2-表5.0.12断路器安装主要√√√√5161.2-表2.0.13电流互感器安装√√5161.3-表3.0.24引下线及跳线安装√√√√5161.4-表7.0.25就地控制设备安装√√5161.8-表1.0.25161.8-表4.0.28集电线路二期进线6U间隔安装√√√5161.1-表4.0.21隔离开关安装√√√√5161.2-表5.0.12断路器安装主要√√√√5161.2-表2.0.13电流互感器安装√√5161.3-表3.0.24引下线及跳线安装√√√√5161.4-表7.0.25就地控制设备安装√√5161.8-表1.0.25161.8-表4.0.29主变进线间隔安装√√√5161.1-表4.0.21隔离开关安装√√√√5161.2-表5.0.12断路器安装主要√√√√5161.2-表2.0.13电流互感器安装√√5161.3-表3.0.24引下线及跳线安装√√√√5161.4-表7.0.25就地控制设备安装√√5161.8-表1.0.25161.8-表4.0.2101#接地变及消弧线圈出线间隔安装√√√5161.1-表4.0.21隔离开关安装√√√√5161.2-表5.0.12断路器安装主要√√√√5161.2-表2.0.13电流互感器安装√√5161.3-表3.0.24引下线及跳线安装√√√√5161.4-表7.0.25就地控制设备安装√√5161.8-表1.0.25161.8-表4.0.2111母磁控电抗器出线间隔安装√√√5161.1-表4.0.21隔离开关安装√√√√5161.2-表5.0.12断路器安装主要√√√√5161.2-表2.0.13电流互感器安装√√5161.3-表3.0.24引下线及跳线安装√√√√5161.4-表7.0.25就地控制设备安装√√5161.8-表1.0.25161.8-表4.0.2121母滤波器出线1间隔安装√√√5161.1-表4.0.21隔离开关安装√√√√5161.2-表5.0.12断路器安装主要√√√√5161.2-表2.0.13电流互感器安装√√5161.3-表3.0.24引下线及跳线安装√√√√5161.4-表7.0.25就地控制设备安装√√5161.8-表1.0.25161.8-表4.0.2131母滤波器出线2间隔安装√√√5161.1-表4.0.21隔离开关安装√√√√5161.2-表5.0.12断路器安装主要√√√√5161.2-表2.0.13电流互感器安装√√5161.3-表3.0.24引下线及跳线安装√√√√5161.4-表7.0.25就地控制设备安装√√5161.8-表1.0.25161.8-表4.0.21435kV消弧线圈及接地变装置安装√√√5161.1-表4.0.21消弧线圈及接地变本体安装√√5161.3-表1.0.3-12变压器检查√√√√5161.1-表1.0.3-21535KV系统设备带电试运主要√√√5161.1-表5.0.5-25161.1-表5.0.5-35无功补偿装置安装√√√5161.1-表4.0.311#SVG连接变压器安装√√√5161.1-表4.0.21变压器本体安装主要√√√√5161.3表1.0.3-12变压器检查主要√√√√5161.3表1.0.3-23变压器附件安装√√5161.3表1.0.3-34变压器注油及密封试验√√√√5161.3表1.0.3-45变压器整体检查√√√√5161.3表1.0.3-56隔离开关安装√√5161.2-表5.0.17避雷器安装√√√√5161.2-表6.0.28支柱绝缘子安装√√5161.2-表7.0.29矩形母线制作安装主要5161.4-表3.0.210软母线安装5161.4-表7.0.221#SVG盘柜安装5161.1-表4.0.21基础型钢安装 √√√ 5161.8表1.0.22配电柜安装 √√√ 5161.8表2.0.23母线安装 √√√√5161.4表3.0.724二次回路检查接线 √√√ 5161.8表7.0.232#SVG连接变压器安装√√√5161.1-表4.0.21变压器本体安装主要√√√√5161.3表1.0.3-12变压器检查主要√√√√5161.3表1.0.3-23变压器附件安装√√5161.3表1.0.3-34变压器注油及密封试验√√√√5161.3表1.0.3-45变压器整体检查√√√√5161.3表1.0.3-56隔离开关安装√√5161.2-表5.0.17避雷器安装√√√√5161.2-表6.0.28支柱绝缘子安装√√5161.2-表7.0.29矩形母线制作安装主要5161.4-表3.0.210软母线安装5161.4-表7.0.242#SVG盘柜安装5161.1-表4.0.21基础型钢安装 √√√ 5161.8表1.0.22配电柜安装 √√√ 5161.8表2.0.23母线安装 √√√√5161.4表3.0.724二次回路检查接线 √√√ 5161.8表7.0.253#SVG连接变压器安装√√√5161.1-表4.0.21变压器本体安装主要√√√√5161.3表1.0.3-12变压器检查主要√√√√5161.3表1.0.3-23变压器附件安装√√5161.3表1.0.3-34变压器注油及密封试验√√√√5161.3表1.0.3-45变压器整体检查√√√√5161.3表1.0.3-56隔离开关安装√√5161.2-表5.0.17避雷器安装√√√√5161.2-表6.0.28支柱绝缘子安装√√5161.2-表7.0.29矩形母线制作安装主要5161.4-表3.0.210软母线安装5161.4-表7.0.263#SVG盘柜安装5161.1-表4.0.21基础型钢安装 √√√ 5161.8表1.0.22配电柜安装 √√√ 5161.8表2.0.23母线安装 √√√√5161.4表3.0.724二次回路检查接线 √√√ 5161.8表7.0.26全站电缆施工√√√5161.1-表4.0.31电缆管配制及敷设√√√5161.1-表4.0.21电缆管配制及敷设√√5161.5-表1.0.22电缆架制作及安装√√√5161.1-表4.0.21电缆架制作及安装√√5161.5-表1.0.33电缆敷设√√√5161.1-表4.0.21屋内电缆敷设√√5161.5-表2.0.22屋外电缆敷设√√5161.5-表2.0.34电力电缆终端制作及安装√√√5161.1-表4.0.21电力电缆终端制作及安装√√5161.5-表3.0.25控制电缆终端制作及安装√√√5161.1-表4.0.21控制电缆终端制作及安装√√5161.5-表3.0.3635KV及以上电缆线路安装√√√5161.1-表4.0.211#SVG连接变压器电缆线路安装主要√√√√5161.5-表4.0.222#SVG连接变压器电缆线路安装主要√√√√5161.5-表4.0.233#SVG连接变压器电缆线路安装主要√√√√5161.5-表4.0.27电缆防火与阻燃主要√√√√5161.1-表4.0.21电缆防火与阻燃√√5161.5-表5.0.27全站防雷及接地装置安装√√√5161.1-表4.0.31避雷针及引下线安装√√√5161.1-表4.0.21避雷针及引下线安装主要√√√√5161.6-表3.0.22接地装置安装√√√5161.1-表4.0.21屋外接地装置安装主要√√√√5161.6-表1.0.22屋内接地装置安装主要√√√√5161.6-表2.0.2。